Kluslijst Jaffa 2018-2019: verschil tussen versies
(36 tussenliggende versies door dezelfde gebruiker niet weergegeven) | |||
Regel 28: | Regel 28: | ||
!scope="col" width="100" | Budget spend | !scope="col" width="100" | Budget spend | ||
!scope="col" | Remarks | !scope="col" | Remarks | ||
|- | |- | ||
| style="background:" | Rigging-09 || Straighten windex | | style="background:" | Rigging-09 || Straighten windex | ||
|1||€ || ||0% ||€ || | |1||€ || ||0% ||€ || | ||
|- | |- | ||
Regel 77: | Regel 52: | ||
!scope="col" width="100" | Budget spent | !scope="col" width="100" | Budget spent | ||
!scope="col" | Remarks | !scope="col" | Remarks | ||
|- | |- | ||
Regel 110: | Regel 81: | ||
|style="background:"| GWE-01 || Schoonmaakazijn in de WC-pomp zuigen om aanslag los te weken | |style="background:"| GWE-01 || Schoonmaakazijn in de WC-pomp zuigen om aanslag los te weken | ||
|3||€ || ||0% ||€ || | |3||€ || ||0% ||€ || | ||
|- | |- | ||
Regel 121: | Regel 88: | ||
| style="background:"| [[#Gwe-07|GWE-07]] || Fix grounding of the keel, no connection atm with the rest of the boat/mast | | style="background:"| [[#Gwe-07|GWE-07]] || Fix grounding of the keel, no connection atm with the rest of the boat/mast | ||
| | |3||€ || Wouter ||0% ||€ || | ||
|- | |- | ||
| style="background:"| GWE-08 || Replace light in port compass | | style="background:"| GWE-08 || Replace light in port compass | ||
|2||€ || Wouter ||0% || || A resistor might do the job | |2||€ || Wouter ||0% || || A resistor might do the job | ||
|- | |- | ||
Regel 144: | Regel 107: | ||
<div style="page-break-after: | <div style="page-break-after:auto"></div> | ||
===Interior=== | ===Interior=== | ||
Regel 163: | Regel 126: | ||
| style="background:orange" | Interior-03 || Fix hinges in kitchen | | style="background:orange" | Interior-03 || Fix hinges in kitchen | ||
|1||€ || Wouter || | |1||€ || Wouter || 75% ||€ || Waiting on pansercoat | ||
|- | |- | ||
|} | |} | ||
<div style="page-break-after: | <div style="page-break-after:always"></div> | ||
===Exterior=== | ===Exterior=== | ||
Regel 184: | Regel 142: | ||
!scope="col" width="100" | Budget spent | !scope="col" width="100" | Budget spent | ||
!scope="col" | Remarks | !scope="col" | Remarks | ||
|- | |- | ||
| style="background:"| Exterior-04 || Replace dyneema lashings for lifelines/jackstays and clipping line | | style="background:"| Exterior-04 || Replace dyneema lashings for lifelines/jackstays and clipping line | ||
|1||€ || ||0% ||€ || | |1||€ || ||0% ||€ || | ||
|- | |- | ||
Regel 209: | Regel 154: | ||
| style="" | Exterior-11 || Iemand met verstand laten kijken naar de deuken in het dek voor de mast | | style="" | Exterior-11 || Iemand met verstand laten kijken naar de deuken in het dek voor de mast | ||
|2||€ || ||0% ||€ || | |2||€ || ||0% ||€ || | ||
|- | |- | ||
|} | |} | ||
<div style="page-break-after: | <div style="page-break-after:auto"></div> | ||
===Inventory=== | ===Inventory=== | ||
Regel 249: | Regel 186: | ||
| style="background:" | Inven-05 || Reserveonderdelen motor voor aan boord tijdens seizoen | | style="background:" | Inven-05 || Reserveonderdelen motor voor aan boord tijdens seizoen | ||
|1||€ || Kasper ||0% ||€ || | |1||€ || Kasper ||0% ||€ || | ||
|- | |- | ||
Regel 560: | Regel 493: | ||
!scope="col" width="100" | Budget spent | !scope="col" width="100" | Budget spent | ||
!scope="col" | Remarks | !scope="col" | Remarks | ||
|- | |||
| style="background:green" | Rigging-01 || Checking the mast | |||
|1||€ || ||100% ||€ || Done | |||
|- | |||
| style="background:green" | Rigging-02 || Checking all cleats and clutches, overhaul if necessary | |||
|1||€ || || 100% ||€ 175,15 || Done | |||
|- | |- | ||
| style="background:green" | Rigging-04 || Check halyards and other lines (sheets, traveller lines) for wear | | style="background:green" | Rigging-04 || Check halyards and other lines (sheets, traveller lines) for wear | ||
|1||€ || Wouter ||100% ||€ || Lines have been checked, no replacements needed | |1||€ || Wouter ||100% ||€ || Lines have been checked, no replacements needed | ||
|- | |||
| style="background:green" | Rigging-05 || Clean and grease the winches (Check [[klusdraaiboek Jaffa]]) | |||
|1|| € || Arthur & Dorien ||100 % ||€ || All done | |||
|- | |||
| style="background:green" | Rigging-06 || Check all blocks | |||
|1||€ || Wouter ||100% ||€ 260 || Done | |||
|- | |- | ||
Regel 570: | Regel 518: | ||
|- | |- | ||
| style="background:green" | Rigging-08 || Check sails and send to sailmaker if necessary | |||
|1||€ || ||100% ||€ || Sails are back, battens are being send over | |||
|- | |||
| style="background:green" | Rigging-10 || Replace mast cuff | |||
|1||€ || Wouter ||100% ||€ 63,28 || Done | |||
|- | |||
|} | |} | ||
Regel 583: | Regel 538: | ||
!scope="col" width="100" | Budget spent | !scope="col" width="100" | Budget spent | ||
!scope="col" | Remarks | !scope="col" | Remarks | ||
|- | |||
| style="background:green" | [[#Engine-01|Engine-01]] || Standaardonderhoud (zie: [[Motor Jaffa#Jaarlijkse_klussen|Algemene gegevens Motor]]) | |||
|1||€ ||Kasper, Ezra ||100% ||€ || Done | |||
|- | |- | ||
Regel 611: | Regel 570: | ||
|- | |- | ||
| style="background:green" | GWE-03 || Check all navigation lights and replace bulbs if needed | |||
|1||€ || Gerard ||100% ||€ || New lenses have been placed | |||
|- | |||
| style="background:green"| [[#GWE-05|GWE-05]] || Check all through-hull openings and replace packing in toilet sea-cocks | | style="background:green"| [[#GWE-05|GWE-05]] || Check all through-hull openings and replace packing in toilet sea-cocks | ||
Regel 618: | Regel 580: | ||
| style="background:green"| [[#Gwe-06|GWE-06]] || Check water tank and rinse/clean if necessary | | style="background:green"| [[#Gwe-06|GWE-06]] || Check water tank and rinse/clean if necessary | ||
|1||€ || Ezra ||100% ||€ || To be done after the boat has been launched | |1||€ || Ezra ||100% ||€ || To be done after the boat has been launched | ||
|- | |||
| style="background:green"| GWE-09 || Replace clipper display with B&G | |||
|1||€ || Jacco & Menno || 100% ||€ || B&G has been fitted, needs to be connected with NMEA 2000 | |||
|- | |- | ||
Regel 642: | Regel 608: | ||
|3||€ || Wouter || 1000% ||€ || No issues | |3||€ || Wouter || 1000% ||€ || No issues | ||
|- | |- | ||
| style="background:green" | Interior-04 || Fix floor planks | |||
|1||€ || Jacco || 100% ||€ || Fitting 'slotplaat' | |||
|- | |||
|} | |} | ||
Regel 655: | Regel 626: | ||
!scope="col" width="100" | Budget spent | !scope="col" width="100" | Budget spent | ||
!scope="col" | Remarks | !scope="col" | Remarks | ||
|- | |||
|style="background:green"| Exterior-01 || Apply new coat of antifouling | |||
|1||€ || || 100% ||€ || | |||
|- | |||
|style="background:green"| Exterior-02 || Repaint hull | |||
|1||€ || Wouter || 100% ||€ || Painting is done, new lettering can be applied on Monday | |||
|- | |- | ||
Regel 663: | Regel 643: | ||
| style="background:green" | Exterior-05 || Replace griptape on the tiller | | style="background:green" | Exterior-05 || Replace griptape on the tiller | ||
|2||€ || Tirza ||100% ||€ || | |2||€ || Tirza ||100% ||€ || | ||
|- | |||
| style="background:green" | Exterior-07 || Solve noises coming from the rudder bearings | |||
|1||€ || Freddy || 100% ||€ || The rudder tube has been fitted, now needs final sanding and painting | |||
|- | |- | ||
| style="background:green" | Exterior-08 || Check lifelines/jackstays | | style="background:green" | Exterior-08 || Check lifelines/jackstays | ||
|1||€ || Ezra|| 100% ||€ || No problems | |1||€ || Ezra|| 100% ||€ || No problems | ||
|- | |||
| style="background:green" | Exterior-12 || Fix leaking companionway hatch | |||
|2||€ || Tom ||100% ||€ || Gasket has been placed | |||
|- | |||
| style="background:green" | Exterior-13 || Repaint the deck wherever necessary | |||
|2||€ || Jacco || 100% ||€ || Done | |||
|- | |- | ||
Regel 688: | Regel 681: | ||
|- | |- | ||
| style="background:green" | [[#Inven-06|Inven-06]] || Check life vests for leaks and firing mechanism | |||
|1||€ || Ewoud ||100% ||€ || Done | |||
|- | |||
|style="background:green" | Inven-07 || Check Dan Buoy for leaks | |style="background:green" | Inven-07 || Check Dan Buoy for leaks |
Huidige versie van 1 mei 2019 om 13:03
Below you can find the kluslijst van Jaffa for the klusseizoen 2018-2019. The jobs are grouped by klusploeg, the order of jobs is random.
Priority:
- Needs to be done in the maintenance season
- Preferably done during the maintenance season
- Could be done in the sailing season
- Can be posponed to the next maintenance season
- We can also leave this be
Feel free to add jobs and request budget.
Vul boodschappen voor de matco-ning of als voorbereiding op een klusweekend hier in, of zet het in de loods op het verlanglijstje.
Overview
Colour coding of the first column: green = finished, orange = job has been started, but isn't finished yet. Hopefully there is a remark stated at the job description.
Rigging
Code | Job | Prio | Budget | Owner | % Completed | Budget spend | Remarks |
---|---|---|---|---|---|---|---|
Rigging-09 | Straighten windex | 1 | € | 0% | € | ||
Rigging-11 | Replace jib halyard (and reshuffle halyard colours in a more sensible way) | 2 | € | Wouter | 0% | € | we have a colour scheme for the halyards |
Engine
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|---|---|---|---|---|---|---|
Engine-03 | Uitlijning schroefas nakijken | 2 | € 0 | Kasper | 0% | €0 | |
Engine-05 | Gas- en keerkoppelingskabel nakijken | 1 | € 0 | Kasper | 0% | €0 |
GWE
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|---|---|---|---|---|---|---|
GWE-01 | Schoonmaakazijn in de WC-pomp zuigen om aanslag los te weken | 3 | € | 0% | € | ||
GWE-04 | Make a manual for the toilet | 3 | € | 0% | € | ||
GWE-07 | Fix grounding of the keel, no connection atm with the rest of the boat/mast | 3 | € | Wouter | 0% | € | |
GWE-08 | Replace light in port compass | 2 | € | Wouter | 0% | A resistor might do the job | |
GWE-11 | Add silver spoon to the water tank (thrift shop) | 3 | € | 0% | € | ||
GWE-12 | Fix autopilot alignment | 2 | € | 0% | € |
Interior
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|---|---|---|---|---|---|---|
Interior-02 | Finish kitchen | 1 | € | Jur | 50% | € | Extra parts are being painted |
Interior-03 | Fix hinges in kitchen | 1 | € | Wouter | 75% | € | Waiting on pansercoat |
Exterior
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|---|---|---|---|---|---|---|
Exterior-04 | Replace dyneema lashings for lifelines/jackstays and clipping line | 1 | € | 0% | € | ||
Exterior-09 | Solve sliding of the railing cushions | 1 | € | 0% | € | ||
Exterior-11 | Iemand met verstand laten kijken naar de deuken in het dek voor de mast | 2 | € | 0% | € |
Inventory
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|---|---|---|---|---|---|---|
Inven-02 | Check grab bag | 3 | € | 50% | € | Elastomull Haft (x2), Idealbinde and Water out of date | |
Inven-03 | Check first aid box and medication box | 1 | € | % | € | Pillendoos expired: Kruidvat Cinnarizine, Immodium. EHBO doos cheched, missing things requested. | |
Inven-04 | Update important documents binder | 1 | € | 0% | € | ||
Inven-05 | Reserveonderdelen motor voor aan boord tijdens seizoen | 1 | € | Kasper | 0% | € | |
Inven-13 | Update charts | 3 | € | 0% | € |
Begroting
Post | Budget | Wat we nu willen | Uitgegeven | |
---|---|---|---|---|
Algemeen | ||||
Rigging | 700 | |||
Engine | 150 | 120 | ||
GWE | 600 | |||
Interior | ||||
Exterior | 500 | |||
Inventory | 800 | |||
Loods algemeen | ||||
(Reservering) Grote uitgave | ||||
Vaarseizoen | 500 | |||
Onvoorzien | ||||
Totaal | 3500 |
Clarification
General
Rigging
Rigging-03
All clutches have been replaced by Spinlock XAS (4-8mm) or Spinlock XTS (6-10mm). Keep the different sizes in mind when ordering new cams
Engine
Engine-01
Elk jaar moet er standaardonderhoud gepleegd worden, zie voor wat er moet gebeuren en al is gedaan: Algemene gegevens Motor.
Engine-02
De motorboer in Enkhuizen heeft in oktober de verstuivers getest en geconstateerd dat deze slecht waren. Worden voor de terugvaart vervangen en lost hopelijk het rookprobleem en mogelijk de trilling in de schroefas op.
Engine-03
De schroefas trilt flink, vooral bij bepaalde toerentallen. Mogelijk komt dit ook doordat de motor niet helemaal regelmatig liep door de slechte verstuivers, dus nadat die zijn vervangen moet er even gekeken worden of het trillen minder wordt. Als het trillen is gebleven moet er naar de uitlijning worden gekeken. Dit kan alleen goed als de boot op de kant staat, dus dor een professional laten doen is lastig.
GWE
GWE-05
Om de 2 jaar moet het vetkoord van de WC afsluiters vervangen worden om lekkage te voorkomen. Het benodigde vetkoord is vierkant 5mm
GWE-07
The keel needs to be connected to the negative terminal of the electric system, as well as the mast in order to provide protection against lightning strikes
Interior
Exterior
Inventory
Inven-06
Reddingsvesten voor controleren oppompen en niet opblazen i.v.m. vocht. Checken op goed vastzitten van de gascilinder en aanwezigheid van kruisbanden. Ook houdbaarheidsdatum patronen checken en kijken of er genoeg reservepatronen zijn. Lekke vesten direct markeren en weggooien!
Nieuwe vesten moeten voorzien zijn van een lampje en sprayhood, de op het moment voordeligste vesten die hieraan voldoen zijn de Marinepool 300N vesten
Inven-11
Actuele voorraad: Media:Vuurwerk_jaffa.xls.
Nodig volgens reglementen (OSR3):
soort vuurwerk | aantal |
---|---|
Rode Parachutes | niet verplicht |
Rode Handflares | 4 |
Oranje Rookpotten | 2 |
Witte Handflares | niet verplicht |
Shopping list
Code | Item | Supplier | Price | Ordered? (Y/N) | Bought by | Owner |
---|---|---|---|---|---|---|
|
drogist | N | Hylke | |||
During the sailing season
Rigging
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|
Engine
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|
GWE
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|
Interior
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|
Exterior
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|
Inventory
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|
Next maintenance season
Rigging
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|
Engine
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|
GWE
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|
Interior
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|
Exterior
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|
Inventory
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|
Completed
Rigging
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|---|---|---|---|---|---|---|
Rigging-01 | Checking the mast | 1 | € | 100% | € | Done | |
Rigging-02 | Checking all cleats and clutches, overhaul if necessary | 1 | € | 100% | € 175,15 | Done | |
Rigging-04 | Check halyards and other lines (sheets, traveller lines) for wear | 1 | € | Wouter | 100% | € | Lines have been checked, no replacements needed |
Rigging-05 | Clean and grease the winches (Check klusdraaiboek Jaffa) | 1 | € | Arthur & Dorien | 100 % | € | All done |
Rigging-06 | Check all blocks | 1 | € | Wouter | 100% | € 260 | Done |
Rigging-07 | Wash sheets and lines | 1 | € | 100% | € | Sheets and lines have been washed | |
Rigging-08 | Check sails and send to sailmaker if necessary | 1 | € | 100% | € | Sails are back, battens are being send over | |
Rigging-10 | Replace mast cuff | 1 | € | Wouter | 100% | € 63,28 | Done |
Engine
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|---|---|---|---|---|---|---|
Engine-01 | Standaardonderhoud (zie: Algemene gegevens Motor) | 1 | € | Kasper, Ezra | 100% | € | Done |
Engine-02 | Rookprobleem oplossen | 1 | € | Kasper | 100% | ~€? | Nieuwe verstuivers voor terugvaat |
Engine-04 | Uitlaatslang vervangen | 1 | € 0 | Kasper, Ezra | 100% | €0 | Is binnen |
GWE
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|---|---|---|---|---|---|---|
GWE-02 | Replace water tubes | 1 | € | Wouter | 100% | € | Drain has been replaced |
GWE-03 | Check all navigation lights and replace bulbs if needed | 1 | € | Gerard | 100% | € | New lenses have been placed |
GWE-05 | Check all through-hull openings and replace packing in toilet sea-cocks | 1 | € | Jacco | 100% | € | Done |
GWE-06 | Check water tank and rinse/clean if necessary | 1 | € | Ezra | 100% | € | To be done after the boat has been launched |
GWE-09 | Replace clipper display with B&G | 1 | € | Jacco & Menno | 100% | € | B&G has been fitted, needs to be connected with NMEA 2000 |
GWE-10 | Fix toilet cover | 1 | € | ???? | 100% | € | Has been refitted |
Interior
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|---|---|---|---|---|---|---|
Interior-01 | Check interior lighting and replace if necessary | 3 | € | Wouter | 1000% | € | No issues |
Interior-04 | Fix floor planks | 1 | € | Jacco | 100% | € | Fitting 'slotplaat' |
Exterior
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|---|---|---|---|---|---|---|
Exterior-01 | Apply new coat of antifouling | 1 | € | 100% | € | ||
Exterior-02 | Repaint hull | 1 | € | Wouter | 100% | € | Painting is done, new lettering can be applied on Monday |
Exterior-03 | Bevestiging kiel controleren (Check keel mount) | 1 | € | Wouter | 100% | € | Done |
Exterior-05 | Replace griptape on the tiller | 2 | € | Tirza | 100% | € | |
Exterior-07 | Solve noises coming from the rudder bearings | 1 | € | Freddy | 100% | € | The rudder tube has been fitted, now needs final sanding and painting |
Exterior-08 | Check lifelines/jackstays | 1 | € | Ezra | 100% | € | No problems |
Exterior-12 | Fix leaking companionway hatch | 2 | € | Tom | 100% | € | Gasket has been placed |
Exterior-13 | Repaint the deck wherever necessary | 2 | € | Jacco | 100% | € | Done |
Inventory
Code | Job | Prio | Budget | Owner | % Completed | Budget spent | Remarks |
---|---|---|---|---|---|---|---|
Inven-01 | Check life raft | 1 | € | Wouter | 100% | € | Is still good |
Inven-06 | Check life vests for leaks and firing mechanism | 1 | € | Ewoud | 100% | € | Done |
Inven-07 | Check Dan Buoy for leaks | 1 | € | Ewoud | 100% | € | |
Inven-08 | Clean bolt cutter and grease hinges | 2 | € | Ezra | 100% | € | Is still good |
Inven-09 | Check EPIRB | 1 | € | Wouter | 100% | € | Has been replaced last year and battery is still good |
Inven-10 | Check tethers for chafing and wear | 1 | € | Anita | 100% | € | |
Inven-11 | Check pyrotechnics (Best before date and quantity) | 1 | € | Niels | 100% | € | Missing white flares, not ORC required |
Inven-12 | Check fire extinguishers certification | 1 | € | Wouter | 100% | € | Checked and on board |
Zie ook
- Grote klussen (Jaffa)
- Kluslijst Jaffa 2017-2018
- Kluslijst Jaffa 2016-2017
- Kluslijst Jaffa 2015-2016
- Kluslijst Jaffa 2014-2015
- Kluslijst Jaffa 2013-2014
- Kluslijst Jaffa tijdens het seizoen 2013
- Kluslijst Jaffa 2012-2013
- Kluslijst Jaffa tijdens het seizoen 2012
- Kluslijst Jaffa 2011-2012
- Kluslijst Jaffa tijdens het seizoen 2011
- Kluslijst Jaffa 2010-2011
- Zeezeilklaarmaken 2010
- Zeezeilklaarmaken 2008