Kluslijst Lasers 2019-2020: verschil tussen versies
Geen bewerkingssamenvatting |
Geen bewerkingssamenvatting |
||
Regel 249: | Regel 249: | ||
| Wash Wetsuits | | Wash Wetsuits | ||
| - | | - | ||
| | | Laura | ||
| | | | ||
| | | | ||
Regel 275: | Regel 275: | ||
|- | |- | ||
| 5 | | 5 | ||
| Centerboard | | Centerboard 1 and 3: Fill in holes | ||
| - | | - | ||
| Freddy | | Freddy | ||
| | | Done | ||
| | | Coated with Panzer coat | ||
|- | |- | ||
| 6 | | 6 |
Versie van 13 jan 2020 21:15
Op deze pagina staat de kluslijst voor Laser Standard, Laser 2 en volgboot voor het klusseizoen 2019-2020.
Overview
An overview of the staus of each boat is presented in the following excel sheet: Bestand:Laser Maintenance19-20.xlsx This sheet also contains a table of spare parts to be bought.
Below is a list of some of the maintenance to be done.
Laser Standard
Maintenance Jobs are split by hull.
Barely Legal
18. Wit
# | Job | Spare Parts to buy | Name | Status | Comments |
---|---|---|---|---|---|
1 | Clean Thoroughly | - | |||
2 | Fix Tip | - | Michiel, Freddy, Niels | Ongoing | Done filling and sanding |
3 | Reattach Drain Plug | - | Niels | Done | |
4 | Fix Self Bailer | Self Bailer | |||
5 | Attach New Hiking Strap and Bungee | - | |||
6 | Place Teflon Mast Step | - | |||
7 | Check deck cleats and plates; tighten | - | |||
8 | Sand down deck repairs | - | Niels | Done |
After Eighteen
19. Groen
# | Job | Spare Parts to buy | Name | Status | Comments |
---|---|---|---|---|---|
1 | Clean Thoroughly | - | |||
2 | Fix Self Bailer | Self Bailer | |||
3 | Check Hiking Strap Bungee | - | |||
4 | Place Teflon Mast Step | - | |||
5 | Check deck cleats and plates; tighten | - |
Kusje Kusje
20. Rood
# | Job | Spare Parts to buy | Name | Status | Comments |
---|---|---|---|---|---|
1 | Fix Tip | - | Michiel, Niels, Freddy | Ongoing: sanding down | |
2 | Attach Self Bailer | Self Bailer | |||
3 | Attach New Hiking Strap and Bungee | - | |||
4 | Place Teflon Mast Step | - | |||
5 | Check deck cleats and plates; tighten | - |
New Laser
21. Groen, glad dek.
# | Job | Spare Parts to buy | Name | Status | Comments |
---|---|---|---|---|---|
1 | Clean Thoroughly | - | |||
2 | Fix Self Bailer | Self Bailer | |||
3 | Reattach Hiking Strap Eyestraps | - | |||
4 | Place Teflon Mast Step | - | |||
5 | Attach Cunningham Carabiner | Small Carabiner | - | ||
6 | Check deck cleats and plates; tighten | - | |||
7 | Think of a fun name! | - |
Spars, Foils, Other
For maintenance tracking purposes all foils and spars have a number associated with them (e.g. "Mast 1"). This number is written on masking tape somewhere on said part. If you have to remove this sticker, reattach it as soon as possible!
# | Job | Spare Parts to buy | Name | Status | Comments |
---|---|---|---|---|---|
1 | Wash Wetsuits | - | Laura | ||
2 | Mast 1: Replace Top section bottom bracket | Said Bracket | |||
3 | Boom 3: Replace Clew Strap | Clew Strap | |||
4 | Sail 4: New Battens | Batten Set | |||
5 | Centerboard 1 and 3: Fill in holes | - | Freddy | Done | Coated with Panzer coat |
6 | Boom 4: New Mainsheet | Mainsheet Line |
Coach Boat
# | Job | Spare Parts to buy | Name | Status | Comments |
---|---|---|---|---|---|
1 | Plug Front Hole | - | |||
2 | Fix deck holes | - | |||
3 | Install Rear Drain Plug | - |
Laser II
Look though inventory and assess what needs to be done to get one or two sailing again.